A MECHANISM FOR PUMPING WATER INTO SMALL OIL FIELDS

dc.contributor.authorTurdiyev Farid Razzok ugli
dc.contributor.authorAshirov Obidjon Nurmamatovich
dc.date.accessioned2025-12-29T11:30:42Z
dc.date.issued2025-02-08
dc.description.abstractWaterflooding was first applied in the Fergana oil fields in 1952, when pilot water injection was started into the peripheral part of the V+VI horizon reservoir of the Yuzhny Alamishik field. The positive effect of the pilot injection, expressed in a certain increase in the flow rate of wells in terms of oil and liquid, gave grounds to start industrial waterflooding of these horizons in 1953.In 1954, waterflooding was started along the VIII horizon of the Khojaabad field and the VII horizon of the Yuzhny Alamishik field.In the first years of the introduction of artificial waterflooding methods, the greatest preference was given to systems for injecting water into the peripheral parts of the reservoirs. However, the process of development and operation of these systems in Fergana faced serious difficulties, mainly due to the poor hydrodynamic connection between the peripheral and oil parts of the reservoir.
dc.formatapplication/pdf
dc.identifier.urihttps://americanjournal.org/index.php/ajtas/article/view/2700
dc.identifier.urihttps://asianeducationindex.com/handle/123456789/17183
dc.language.isoeng
dc.publisherAmerican Journals Publishing
dc.relationhttps://americanjournal.org/index.php/ajtas/article/view/2700/2546
dc.rightshttps://creativecommons.org/licenses/by-nc/4.0
dc.sourceAmerican Journal of Technology and Applied Sciences; Vol. 32 (2025); 23-29
dc.source2832-1766
dc.subjectOil field, Waterflooding, Development system, Oil recovery factor, Reservoir pressure, Well grid, Injection well, Multilayer object, Production regulation, Fergana
dc.titleA MECHANISM FOR PUMPING WATER INTO SMALL OIL FIELDS
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion
dc.typePeer-reviewed Article

item.page.files

item.page.filesection.original.bundle

pagination.showing.labelpagination.showing.detail
loading.default
thumbnail.default.alt
item.page.filesection.name
ugli_2025_a_mechanism_for_pumping_water_into_small.pdf
item.page.filesection.size
517.78 KB
item.page.filesection.format
Adobe Portable Document Format

item.page.collections