Inspection And Diagnostics Of Railway Reinforced Concrete Bridge In Andijan-Khanabad Peregon
| dc.contributor.author | U.Z. Shermuhamedov | |
| dc.contributor.author | Sh.Z. Nishonboyev | |
| dc.contributor.author | U.K. Abduraimov | |
| dc.contributor.author | F.Z. Zokirov | |
| dc.date.accessioned | 2026-01-02T12:08:21Z | |
| dc.date.issued | 2022-08-22 | |
| dc.description.abstract | The article presents practical recommendations for determining the load-carrying capacity of the railway reinforced concrete bridge located at 346+605 km of the Andijan railway distance Andijan-Khanabad. To ensure the safety of vehicles, it is recommended to build a new bridge or replace the main part of the bridge. | |
| dc.format | application/pdf | |
| dc.identifier.uri | https://geniusjournals.org/index.php/ejet/article/view/2070 | |
| dc.identifier.uri | https://asianeducationindex.com/handle/123456789/78541 | |
| dc.language.iso | eng | |
| dc.publisher | Genius Journals | |
| dc.relation | https://geniusjournals.org/index.php/ejet/article/view/2070/1816 | |
| dc.rights | https://creativecommons.org/licenses/by-nc/4.0 | |
| dc.source | Eurasian Journal of Engineering and Technology; Vol. 9 (2022): EJET; 77-83 | |
| dc.source | 2795-7640 | |
| dc.subject | Bridge | |
| dc.subject | operational period | |
| dc.subject | diagnostics | |
| dc.subject | monitoring | |
| dc.title | Inspection And Diagnostics Of Railway Reinforced Concrete Bridge In Andijan-Khanabad Peregon | |
| dc.type | info:eu-repo/semantics/article | |
| dc.type | info:eu-repo/semantics/publishedVersion | |
| dc.type | Peer-reviewed Article |
item.page.files
item.page.filesection.original.bundle
pagination.showing.detail
loading.default
- item.page.filesection.name
- shermuhamedov_2022_inspection_and_diagnostics_of_railway_re.pdf
- item.page.filesection.size
- 434.12 KB
- item.page.filesection.format
- Adobe Portable Document Format