Hot Gas Path Inspection (Hgpi) Of Gas Turbine Unit Type Ge Frame 9e An Documentary Study Involved the Steps of the (Hgpi) After 32k Running Hours of The Unit

dc.contributor.authorKadhim KASHI
dc.date.accessioned2025-12-29T08:05:47Z
dc.date.issued2024-04-28
dc.description.abstractThis paper details the Hot Gas Path Inspection (HGPI) procedure, a crucial periodic maintenance task for Frame-9E gas turbine units manufactured by General Electric. Regular HGPIs are essential for ensuring efficient and reliable operation of the turbines and preventing internal component damage. The HGPI process is divided into three main stages: disassembly, inspection, and reassembly. During disassembly, various components are meticulously removed, including the turbine roof, burners, combustion chambers, and turbine blades. A detailed inspection follows, focusing on parts designated for replacement and those generally left untouched during HGPI. Based on the inspection findings, necessary replacements are made, and components are thoroughly cleaned before reassembly. The reassembly stage involves meticulously reinstalling all previously removed components while adhering to strict measurements and specifications. Following the successful completion of HGPI and any related auxiliary system maintenance, the gas turbine unit is signed off as operational and ready to be handed over to the operations team
dc.formatapplication/pdf
dc.identifier.urihttps://peerianjournal.com/index.php/tpj/article/view/817
dc.identifier.urihttps://asianeducationindex.com/handle/123456789/14533
dc.language.isoeng
dc.publisherPeerian Journals Publishing
dc.relationhttps://peerianjournal.com/index.php/tpj/article/view/817/680
dc.rightshttps://creativecommons.org/licenses/by/4.0
dc.sourceThe Peerian Journal; Vol. 29 (2024): TPJ; 73-88
dc.source2788-0303
dc.subjectTurbine
dc.subjectIraq
dc.subjectGE Frame 9E
dc.subjectReplenishment Principle
dc.titleHot Gas Path Inspection (Hgpi) Of Gas Turbine Unit Type Ge Frame 9e An Documentary Study Involved the Steps of the (Hgpi) After 32k Running Hours of The Unit
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion
dc.typePeer-reviewed Article

item.page.files

item.page.filesection.original.bundle

pagination.showing.labelpagination.showing.detail
loading.default
thumbnail.default.alt
item.page.filesection.name
kashi_2024_hot_gas_path_inspection_hgpi_of_gas_turb.pdf
item.page.filesection.size
1.51 MB
item.page.filesection.format
Adobe Portable Document Format

item.page.collections