IMPROVING NETWORK-BASED CALENDAR SCHEDULING IN CONSTRUCTION WORK PLANNING
| dc.contributor.author | Abdurakhmanov Ulugbek Arabdjon ogli | |
| dc.contributor.author | Rasuljon Khamitov Khasanjon ogli | |
| dc.date.accessioned | 2025-12-29T12:12:24Z | |
| dc.date.issued | 2025-12-22 | |
| dc.description.abstract | In this article, the significance of network-based scheduling in the planning of contemporary construction works is examined, methods for improving such schedules are analyzed, and, based on the results obtained, recommendations are developed for their widescale practical application in accordance with construction norms and regulations, along with several specific proposals | |
| dc.format | application/pdf | |
| dc.identifier.uri | https://westerneuropeanstudies.com/index.php/1/article/view/3148 | |
| dc.identifier.uri | https://asianeducationindex.com/handle/123456789/18555 | |
| dc.language.iso | eng | |
| dc.publisher | Western European Studies | |
| dc.relation | https://westerneuropeanstudies.com/index.php/1/article/view/3148/2193 | |
| dc.rights | Copyright (c) 2025 Western European Journal of Modern Experiments and Scientific Methods | |
| dc.rights | https://creativecommons.org/licenses/by-nc/4.0 | |
| dc.source | Western European Journal of Modern Experiments and Scientific Methods; Vol. 3 No. 12 (2025): WEJMESM; 100-106 | |
| dc.source | 2942-1896 | |
| dc.subject | Construction | |
| dc.subject | Gantt charts | |
| dc.subject | linear schedules | |
| dc.title | IMPROVING NETWORK-BASED CALENDAR SCHEDULING IN CONSTRUCTION WORK PLANNING | |
| dc.type | info:eu-repo/semantics/article | |
| dc.type | info:eu-repo/semantics/publishedVersion | |
| dc.type | Peer-reviewed Article |
item.page.files
item.page.filesection.original.bundle
pagination.showing.detail
loading.default
- item.page.filesection.name
- ogli_2025_improving_network-based_calendar_schedul.pdf
- item.page.filesection.size
- 354.08 KB
- item.page.filesection.format
- Adobe Portable Document Format