INVESTIGATION OF THE OPERATIONAL EFFICIENCY OF A GAS-CONDENSATE FIELD USING GAS CYCLING

dc.contributor.authorGayrat Abdiraimovich Khushvaqtov
dc.contributor.authorSaltanat Pari Otamurodovna Otamurodova
dc.date.accessioned2025-12-29T18:16:57Z
dc.date.issued2025-06-13
dc.description.abstractIn this study, the feasibility of applying dry gas injection technology at different pressure depletion stages in a gas-condensate reservoir was investigated. The injection process was carried out based on various ratios of injection wells to production wells (4:1, 3:1, 2:1, 1:1, and 1:2). Dry gas injection periods ranging from 1 to 3 years were studied using the Kultak gas-condensate field as a case example, with the aim of evaluating their impact on improving the condensate recovery factor. A hydrodynamic reservoir model was employed for the analysis, which was calibrated using historical production data from the field, allowing for a systematic and integrated approach. Compared to the conventional production method based solely on natural pressure depletion, the gas cycling method demonstrated a 9% increase in the condensate recovery factor. The results of the study indicate that gas injection has a significantly positive impact on enhancing the recovery efficiency of both condensate and gas when compared to traditional recovery methods. Based on the findings, this approach provides a practical and efficient solution for the rapid evaluation and implementation of enhanced recovery techniques in gas-condensate reservoirs with low to moderate C5+ liquid hydrocarbon content.
dc.formatapplication/pdf
dc.identifier.urihttps://webofjournals.com/index.php/4/article/view/4637
dc.identifier.urihttps://asianeducationindex.com/handle/123456789/25472
dc.language.isoeng
dc.publisherWeb of Journals Publishing
dc.relationhttps://webofjournals.com/index.php/4/article/view/4637/4593
dc.rightshttps://creativecommons.org/licenses/by-nc-nd/4.0
dc.sourceWeb of Technology: Multidimensional Research Journal; Vol. 3 No. 6 (2025): WOT; 42-50
dc.source2938-3757
dc.subjectGas-condensate reservoir, injection well, dry gas, recovery factor, viscosity, gas cycling.
dc.titleINVESTIGATION OF THE OPERATIONAL EFFICIENCY OF A GAS-CONDENSATE FIELD USING GAS CYCLING
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion
dc.typePeer-reviewed Article

item.page.files

item.page.filesection.original.bundle

pagination.showing.labelpagination.showing.detail
loading.default
thumbnail.default.alt
item.page.filesection.name
khushvaqtov_2025_investigation_of_the_operational_efficie.pdf
item.page.filesection.size
732.84 KB
item.page.filesection.format
Adobe Portable Document Format

item.page.collections