ENGINEERING AND GEOTECHNICAL SURVEYS AT THE SITE OF THE MAIN STRUCTURES OF THE PSKEM HYDROELECTRIC POWER STATION ON THE PSKEM RIVER

dc.contributor.authorНазаров Комил Игамбердиевич
dc.contributor.authorХидоятов Захиджан Даливаевич
dc.contributor.authorХидоятов Абдуллох Захиджон ўғли
dc.date.accessioned2025-12-28T20:18:18Z
dc.date.issued2023-04-30
dc.description.abstractThis paper presents the results of geomechanical studies of the siltstone massif carried out in the right-bank experimental adit at the site of the Pskemskaya HPP dam. Primary shear experiments were carried out at the following 6 normal pressures on the stamp σ: 0.5 MPa; 1.0 MPa; 1.5 MPa; 2.0 MPa, 2.5 MPa and 3.0 MPa.
dc.formatapplication/pdf
dc.identifier.urihttps://sjird.journalspark.org/index.php/sjird/article/view/631
dc.identifier.urihttps://asianeducationindex.com/handle/123456789/13488
dc.language.isoeng
dc.publisherJournals Park Publishing
dc.relationhttps://sjird.journalspark.org/index.php/sjird/article/view/631/605
dc.sourceSpectrum Journal of Innovation, Reforms and Development; Vol. 14 (2023); 221-226
dc.source2751-1731
dc.subjectstamp, strength, ultimate strength, siltstone, shear, shear angle, cracks.
dc.titleENGINEERING AND GEOTECHNICAL SURVEYS AT THE SITE OF THE MAIN STRUCTURES OF THE PSKEM HYDROELECTRIC POWER STATION ON THE PSKEM RIVER
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion
dc.typePeer-reviewed Article

item.page.files

item.page.filesection.original.bundle

pagination.showing.labelpagination.showing.detail
loading.default
thumbnail.default.alt
item.page.filesection.name
untitled_2023_engineering_and_geotechnical_surveys_at.pdf
item.page.filesection.size
374.16 KB
item.page.filesection.format
Adobe Portable Document Format

item.page.collections